Success StoryManufacturing & Distribution

AI-Led Network Optimization for a Leading Electrical Equipment Manufacturer

Translytics Team15/4/202510 min read
Top Indian Electrical Equipment Company
40 Branches | 17 Warehouses | 12 Plants
India
Location

The Challenge

A leading electrical equipment manufacturer was struggling with rising cost-per-ton-km and delays in customer fulfillment due to misaligned plant-to-customer flows. Manual dispatch planning, suboptimal truck utilization, and high freight expenses resulted in inefficient logistics operations, leading to higher working capital and fulfillment delays.

Key Problem Areas

  • Limited multi-node visibility
  • Static network allocation logic
  • High rebalancing and holding costs
  • Manual exception monitoring

Our Solution

Translytics deployed its AI-Powered Network Optimization Platform with Center-of-Gravity (CoG) simulations and route modeling. The solution automated dispatch planning, aligned plant-to-warehouse-to-customer flows, and improved truckload efficiency. With auto-dispatch triggers based on real-time inventory and demand signals, the client achieved a leaner, more cost-effective distribution network.

Network Optimization Engine

Enhances overall network responsiveness.

Inventory Rebalance Automation

Automates inventory redistribution efficiently.

Real-Time Visibility Dashboards

Provides instant, actionable network insights.

Exception & Risk Alerts

Proactively flags disruptions and risks.

Key Results

14%
Logistics Cost Reduction
Reduced logistics and freight costs
18% ↑
Truck Utilization
Improved truckload efficiency across plants and warehouses
320+/month
Auto-Dispatches
Automated inventory-based dispatches executed monthly
4 CoG Models
Simulations
Center-of-Gravity simulations for optimized network design

Client Testimonial

"Translytics helped us streamline our logistics network by replacing manual dispatch planning with AI-driven optimization. The improvements in cost efficiency and customer service are remarkable."
HSC
Head of Supply Chain
Electrical Equipment Manufacturer
Top Indian Electrical Equipment Company

Implementation Details

12 weeks
Duration
20 members
Team Size
4
Modules

Modules Implemented

Network OptimizationDispatch PlanningCoG SimulationsRoute Modeling

Tags

Electrical EquipmentNetwork OptimizationAI DispatchCost EfficiencyB2B Distribution